SAP Readiness Check for SAP S/4HANA upgrades

The SAP readiness check is normally used to asses the impact of an ECC to an S4HANA system upgrade or conversion (read this blog).

It can also be used to asses the impact of an upgrade of a lower S4HANA version to a newer S4HANA version.

Preparation for the S4HANA readiness check

First apply the notes listed in master note 3059197 – SAP Readiness Check for SAP S/4HANA upgrades. If you have a short dump after start of program RC_COLLECT_ANALYSIS_DATA, follow the instructions in OSS note 3093810 – Executing report RC_VALUE_DISCOVERY_COLL_DATA immediately results in an ABAP Dump CX_SY_DYN_CALL_ILLEGAL_FUNC.

Also apply the notes mentioned in OSS note 3061414 – Enabling extended integration impact analysis for SAP Readiness Check, if you want to include ALE scenario’s in your analysis.

Running the check

Start program RC_COLLECT_ANALYSIS_DATA:

Start the batch job and wait until it is done.

Start program RC_COLLECT_ANALYSIS_DATA again and push button Download Analysis Data.

This file you need to upload on the SAP Readiness check site.

Result

After you have uploaded the results SAP needs about 1 hour to process the results. Then you can look at the items you need to consider for your S4HANA release upgrade:

Remark: the amount of items will be far less than the ECC to S4HANA conversion readiness check.